Welcome to Tianchang Pulandi Purification Equipment Co., Ltd

Clean decoration project pay attention to what problems

Views:1
Update time:2025-03-27

Clean decoration projects need to pay attention to the following issues:
Design and construction specifications:
Before construction, the ground, walls, ceiling and other surfaces of the clean room must be thoroughly cleaned to ensure that the surface is smooth, dust-free and pollution-free.
The construction process should avoid the use of easy pollution, volatile, easy to produce dust materials, such as plastic, wood, etc.
The construction of the clean room must be carried out in accordance with the design drawings, and it is strictly forbidden to change the construction drawings without permission. If any changes are necessary under special circumstances, they should be communicated with the design unit in advance and approved before proceeding.
Material selection:
The selected material must have good corrosion resistance, wear resistance, easy to clean and other characteristics, the surface should be smooth and flat, not easy to produce dust and bacteria.
The floor material can choose epoxy self-leveling floor, PVC floor, etc., the wall and ceiling material can choose color steel plate, stainless steel plate, aluminum-plastic plate, etc.
The sealing material should have good sealing performance, not easy to age and easy to construct.
Construction process control:
During the construction process, attention should be paid to avoid cross-contamination, isolation measures should be taken in the construction of different areas, and construction materials, tools, etc., should also be managed in different areas.
During the construction process, pay attention to preventing static electricity and electromagnetic interference, and take anti-static measures for materials that may generate static electricity.
Strict monitoring and testing should be carried out during the construction process, and the problems found should be dealt with in time to ensure that the construction quality and environment meet the design requirements.
Sealing and ventilation system:
The tightness of the clean room is an important factor to ensure cleanliness, and the sealing treatment of doors, Windows, gaps and other parts should be tight.
The layout of the ventilation system is reasonable and the operation is stable. Suitable filters and air treatment equipment should be selected according to the production requirements and cleanliness requirements.
Lighting Design:
The lighting design of the clean room should ensure that the light is uniform and soft, avoid glare and shadows, and give priority to energy-saving lamps such as LED.
Post-maintenance:
The clean room should be cleaned and disinfected regularly during use to ensure that it is sterile, dust-free, odor-free and meets the requirements of use.
Clean rooms should be tested and verified before being p

Leave Your Message